|
|
Modcon News
|
|
FAT successfully completed for TANEKO Nijnekamsk refinery project (Tatarstan, Russia)
Nijnekamsk, Russia
16 July, 2010
|
|
|
Two AGIP-KCO gas analyzer shelters have been shipped to Kazakhstan
Kazakhstan
12 July, 2010
|
|
|
FAT successfully completed for gasoline and fuel oil blending analyzer houses (Tupras-Turkey)
Ismit, Turkey
7 January, 2010
|
|
|
ATEX directive 94/9/EC Quality Assurance Certification received for 2009 (London, UK)
London, UK
29 November, 2009
|
|
|
MODCON completes acquisition of Petrometrix Ltd. together with its affiliates Petrometrix Inc.
21 October, 2009
|
|
|
Modcon has attended the 5-th International Specialised Exhibition and Conference Infosecurity Russia (Russia)
Moscow, Expocentr at Krasnaya Presnya, pavilion 7
3 October, 2009
|
|
|
Final report presentation for on-line analyzers implementation project in Petrobrazi Units (Romania)
Romania
29 September, 2009
|
|
|
Modcon at the 29th International Exhibition-Congress ACHEMA-2009, Messe Frankfurt
Exhibition Grounds of Messe Frankfurt GmbH - Hall 10.2 Stand D22
15 May, 2009
|
|
|
Final project meeting for gasoline in-line blending project basic engineering at ROSNEFT Achinsk Refinery (Russia)
Achinsk, Russia
23 April, 2009
|
|
|
Factory acceptance completed for supply the process analyzers system to TNK-BP Razan Refinery (Russia)
Russia
23 February, 2009
|
|
|
FAT completed for gasoline in-line blending analyzer system ordered by FMC Technologies (USA)
Romania
24 September, 2008
The system includes FTIR Analyzer, RVP Analyzer, 3 Gas-chromatographs and Density Analyzer. The analyzers have been installed in the stainless steel analyzer house, together with sample conditioning systems including air-conditioning, power distribution, lighting, termination and junction boxes, gas and flame detection, relevant piping and wiring.
|
|
|
Performance validation successfully completed for Petrom-OMV Petrobrazi Refinery Isomerisation and AVD-2 Analyzer Houses (Romania)
Romania
11 August, 2008
|
|
|
Successful commissioning and start-up completed for the crude/water separation monitoring system for oil company AOS (Azerbaijan)
Azerbaijan
6 August, 2008
|
|
|
On-site installation was successfully completed for supply the Lukoil Volgograd Refinery Gasoline Blending Process Analysis System (Russia)
Russia
4 August, 2008
|
|
|
Modcon product quality analyzers have been enlisted for satisfactory execution the orders with Engineers India Limited (India)
India
16 May, 2008
|
|
|
Modcon has been awarded EPC contract from Sigma Aldrich (Israel)
Switzerland
15 February, 2008
|
|
|
SAT has been successfully completed for Volgograd Refinery Isomerization Plant analytical system (Russia)
Russia
3 February, 2008
|
|
|
|