This feasibility study objectives were:
- Increase units productivity and product quality, which should be constant and independent of the material
- Better CDU performance during the crude switch
- Minimization of product giveaway during the crude switch
- Integration of process analysis control with APC
- Improved quality of analysis and response time
- Minimize the operational / maintenance costs
- Improved automation
- Reduction in required labor force (especially laboratory and field staff)
- Improvement of overall environmental situation in accordance with the requirements of environmental protection regulations
- Optimization of networks